top of page

H&M

Location | Nir Zvi

Launch |  Planned to 2026

Built area | 15,000 sqm

Project Content |

Functional design - a new logistics center

Logistics systems |

Automatic system Shuttle System - picking for stores and online. Pallet jacks 18 m high, tower forklifts. WMS implementation support

Rami Levi Chain Stores

Location | Ligad Modi'in industrial zone

Launch |  2018

Built area | 30,000 sqm

Project Content |

Functional design - a new logistics center

Logistics systems |

Pallet racks, flow rack, pushback, reach trucks, pick-by-voice, weight check, TMS, WMS

Clalit

Location | Shoham

Launch |  2016

Built area | 15,000 sqm

Project Content |

Functional design - a new logistics center

Logistics systems |

Automatic Shuttle System - PTL systems
17 m high pallet jacks, turret and reach forklifts

Wili Food

Location | Yavne

Launch |  Planned for 2025

Built area | 6,000 sqm

Project Content |

Functional design - Expansion of an existing logistics center

Logistics systems |

Automatic system 40 m height supported attevaots - cooling and freezing. A picking floor and a factory floor on the automatic side

ORSHAR

Location | Ashdod

Launch |  Planned for 2025

Built area | 30,000 sqm

Project Content |

Functional design - a new logistics center

Logistics systems |

Automatic system 40 m height supported by scaffolding + conventional structure on 3 levels

Domicile

Location | Kibutz Gezer

Launch |  2022

Built area | 10,000 sqm

Project Content |

Functional design - a new logistics center

Logistics systems |

Pallet stackers, Cantilever, high light stackers, reach forklifts, high and low stackers

Electra Elevators

Location | Kibutz Naan

Launch |  Planned for 2025

Built area | 6,000 sqm

Project Content |

Conventional planning - transition to an existing logistics center

Logistics systems |

Many logistics systems on site that includes a large number of small warehouses

ZAGA

Location | Shoham

Launch |  2023

Built area | 4,000 sqm

Project Content |

Conventional planning - transition to an existing logistics center

Logistics systems |

Pallet stackers, reach forklifts and picking trucksWMS implementation support

Nyga

Location | Tzur Yigal

Launch |  2023

Built area | 6,000 sqm

Project Content |

Conventional planning - transition to an existing logistics center

Logistics systems |

Pallet stackers, reach forklifts and picking trucks
WMS implementation support

Danlog | Intercosma

Location | Ariel industrial zone

Launch |  2019

Built area | 25,000 sqm

Project Content |

Functional design - a new logistics center + Added value production

Logistics systems |

Double/single pallet racks, pushback, DD reach trucks, existing WMS system

Poliva

Location | Lod industrial zone

Launch | existing site

Project Content |

Project 1 – setup of a cold storage building + replacement of existing storage systems in several site-compounds

Project 2 – preparing a masterplan for the arrangement and setup of an automated pallet warehouse, integrated in a new distribution center

Logistics systems |

Pallet radio shuttle system, an automated warehouse for pallets and a new warehouse for order picking

Gilar

Location | Modi'in-Shoham industrial zone

Launch |  2018

Built area | 7,000 sqm

Project Content |

Functional design – a new logistics center + WMS plant layout

Logistics systems |

Pallet racks and reach trucks

Kravitz

Location | Existing site

Launch |  2019

Built area | 10,000 sqm

Project Content |

Study of the existing layout, design of building expansion, and implementation of picking and sorting advanced technologies

Logistics systems |

Under implementation

Hameshavev

Location | Kiryat Gat industrial zone

Launch |  2019

Built area | 11,300+3,800sqm

Project Content |

Logistics center building: functional design – a new logistics center + production departments

Production building: designing the assembly lines and a CnC machinery layout, including a front warehouse and material-flow pocesses

Logistics systems |

Pallet racks, reach trucks

Hanamal

Location | Ligad Modi'in industrial zone

Launch |  2018

Built area | 8,000 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

Pallet racks, drive in, reach trucks, pick-by-voice, weight check in pickers, WMS

Columbia

Location | Airport City industrial zone

Launch |  2016

Built area | 2,500 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

High carton shelving, pallet racks, drive-in, high order picking truck, reach trucks, WMS

ABC

Location | Petah Tikva 

Launch |  2018

Built area | 3,000 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

High carton shelving, high order picking truck, vertical automated warehouse

Couscous Maison

Location | Kadima industrial zone

Launch |  2018

Built area | 3,000 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

Pallet racks, drive in, reach trucks

Golmat

Location | Emek Hefer industrial zone

Launch |  2018

Built area | 6,700 sqm

Project Content |

Functional design – a new logistics center + design of production layout

Logistics systems |

DD pallet racks, reach trucks, external/internal cantilever

Johnson & Johnson

Location | Kfar Saba new industrial zone

Launch |  2019

Built area | 2,000 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

Suspended-aisle mezzanine, freight elevators, pallet racks, reach trucks

Biopet

Location | Maabarot Industries industrial zone

Launch |  2020

Built area | 4,600 sqm

Project Content |

Functional design – a new logistics center

Project Content |

Pallet racks, drive in, reach trucks and order picking truck

Dip Marketing

Location | Kfar Saba new industrial zone

Launch |  2020

Built area | 5,500 sqm

Project Content |

Functional design – a new logistics center + cold storage rooms of different temperatures

Logistics systems |

Pallet racks, PushBack (roller system), reach trucks and order picking truck

Karton Hadarom

Location | Timorim
industrial zone

Launch |  2018

Built area | 2,700+2,600 sqm

Project Content |

Functional design – 2 new logistics centers enabling concurrent joint work – one to be used by the Company and the other for hire

Logistics systems |

Pallet racks, articulated forklift

Paz

Location | Binyamina industrial zone

Launch |  2019

Built area | 2,000 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

High carton shelving, high order picking truck, pallet racks, reach trucks

Paz Movil

Location | Kanot industrial zone

Launch |  2021

Built area | 3,300 sqm

Project Content |

Functional design – a new logistics center + cold storage rooms of different temperatures

Logistics systems |

Pallet racks, PushBack (roller system), reach trucks and order picking truck

Chapnik

Location | Modi'in industrial zone

Launch |  2021

Built area | 3,000 sqm

Project Content |

1. Designing a service and sales garage system – workstations, different service rooms, welding workshop and carwash

2. Functional design – a new logistics center

Logistics systems |

Moving rack system, high order picking truck, light-storage technical mezzanine

Rani Atzmon

Location | Barkan industrial zone

Launch |  2019

Built area | 3,500 sqm

Project Content |

Functional design – a new logistics center

Logistics systems |

Pallet racks, drive in, reach trucks and order picking truck

bottom of page